色噜噜狠狠色综合日日,最新亚洲AV日韩AV一区二区三区,公的大龟慢慢挺进我的体内视频,66lu国产在线观看

Product & Service

Adding Grounding test column for GZ Metro Line 3


There is a large amount of maintenance in the Low voltage cabinet. The original equipment has not fully considered the grounding wire hanging position during the overhaul and brought big inconvenience to the daily overhaul. 

After full assesment on the equipment, we design a complete plan and add Grounding device for Guangzhou Metro Line 3.







eee.png


ttt.png
451.jpg



Engineer mounting the 

equipment.


Part of the detail




Succesfully adding the 

Grounding Device